Here's an update of where we are at.....looks like a big old mess huh!!! Here is a shot of the front of our house.
The opening is where the front door will be located.
This is a shot from the back where the basement windows are.
This is the only way in the house right now until it gets backfilled.
Here's another picture of the back windows and the metal forms are of the stairs leading to the basement from the garage.
Here's another shot of the back side of the house, the garage will go here - someday!
This is the back of the house. You can see our existing house in the back of the picture.
Here's an up close shot at what the blocks actually look like on the inside before they are filled with concrete and rebar.Tomorrow (Saturday, October 16th) we are pouring the remainder of the basement walls and just above where the first floor elevation is. This will allow us to set the beam and floor joists and then backfill the house. It will be so much easier to access our house from this point on. We are still hoping to have it under roof by winter!




The semi-truck arrived about 8:15 a.m. Saturday morning.
Dave unloaded the blocks with the skidster.
Our pile of blocks sitting in the yard!






Picture of the geo-thermal and plumbing pipes.
Getting Ready for the basement floor pour (with Ava's help!)







Here is a shot of all the rebar and formadrain in place.







The Front of our house with our wrap around porch so we can sit outside and watch the horses!


Many weeks went into tweeking our floor plans. We rearranged rooms countless times, but I think we finally have what we are going to build! This is the first floor plans. The living room will be open to the 2nd floor and the kitchen will be open to the living room with arches between columns.
The kids bedrooms will be upstairs and the loft is a space for all the toys....finally! There will be a door at the end of the hall leading to my "Future Stamp Room". I can't wait to have that room complete!