Sunday, September 18, 2011

An Update....Finally

It's been hard to keep this updated with everything going on, Ethan's Rodeo, our new baby, Emelia, the house building.....etc! Here are some outside and inside shots of our progress. The plumbers have finished the rough-ins, the HVAC are finishing up our geothermal system rough-in, Dave has started on the electric wiring, siding is up on the East and partially on the North side of the house, the garage is up, all the stud walls are up, the cabinets are ordered, plumbing fixtures and lighting fixtures have been picked out and the tile/flooring is all picked out too. We are hoping to start drywall in the next couple weeks and to get the house sealed up before winter hits again. Dave thinks we could be in before the end of winter.....but winter technically goes until sometime in March!


Looking up from our great room....kind of hard to visualize, but the room on the left is the dining room.



The siding on the east side of the house.



A view from the winery road.




Another view from the winery road.

The kids shower/tub upstairs.

A look over our great room from the upstairs hallway




Our steps up to our landing.

Thursday, June 23, 2011

We have a Roof and Windows!

We are "still" working on our house, the weather just hasn't been cooperating the way we would like. The roof was finally finished the last couple weeks in May. Then we started to get more rain and couldn't get the JLG around to close up the peaks of the house. So this is how the house sat for quite a while. Didn't they do a nice job with the backfilling! We don't have those big mounds of dirt anymore so I can actually see the house from my kitchen window!Here is a shot of the house with all of the windows (minus the front door)! You can click on the picture to see them in more detail, but I believe this is what they refer to as prairie style windows. Now I can't wait to see what the house will look like with our wrap around porch.Here is a view of the East side of the house!And the back side!And this is where the garage will eventually be!The back of the house!

This is a view from the inside of the house looking down onto our living oom!










Another shot of our open living room1

Saturday, May 7, 2011

House Rendering - "Colored"




I attempted to color in the rendering of our house. I did this using paint, so it doesn't look the greated, but you get the "picture". There will be some stone on the front of the house at the bottom left where the porch isn't located. You would think I could do better with my rendering doing what I do for a living, but all the "good" programs are at work!

Trusses are up!

The trusses are up and the roof is getting started! Our house is starting to finally look like a home! The rainy weather put off this process for a couple weeks! It's really starting to come together now! We just picked out the color of our rim board that will go at the bottom of the roof line. We chose to match the cranberry red on the barn and the soffits will match as well. The siding on the house will be green like the barn too.










Dave took this picture with his phone last night to show me the progress! The kids and I left him to work in peace and quiet while we are having fun in Florida! Looks like he is getting a lot finished! I'm anxious to see the roof complete and then time for the windows. They are in and waiting for us at Doors-n-More!

Wednesday, April 6, 2011

No New Pics, but an Update!

Last Wednesday, March 30th, our second floor walls were poured! 36 total yards and now our house walls are complete. The windows should be in any day now and the trusses were ordered! Our house should start taking shape soon with a roof and windows to fill all the holes!

Tuesday, March 22, 2011

The Blocks are set!


All the blocks have been set and we are ready for the remaining rebar and bracing.....hoping to pour the second floor in a couple of weeks!

Saturday, March 12, 2011

We have a 2nd Floor!

This hasn't been the easiest winter to build a house, but Dave keeps on working! My Dad, Dave, and a friend helped get all the floor joists up and the subfloor down for the 2nd floor. Now our house is finally starting to take shape! Here is a view from our bedroom into the dining room. We actually have some walls up downstairs. Actually almost all of the walls are up because we have such an open floor plan. we still have the bathroom wall, bedroom, pantry and 1/2 bath wall to go up, but other than that the house is wide open!
Here is a view into our bedroom. The windows are spaced so a king sized bed will fit in between. The smaller window is actually on the other side of the bathroom wall and sits just above our whirlpool tub! (Dave says it is a waste of money for this tub....we will see!)

Here is another shot into the master bedroom and the small wall is the back wall of the 1/2 bath off of the kitchen.


Dave, Ava, and Kale are patiently waiting on me to take pictures. They are standing in the middle of our kitchen. The big opening is what leads to our "locker room" that will house our shoes and coats. It leads into the kitchen directly from the garage. This also walks into our walk in pantry!

Here is a view from the top. That is the second floor subfloor. We are up in Dave's toy, his JLG. All of the subfloor is down now and Dave has started to put up the blocks and windows for the 2nd story! It's supposed to be a nice weekend so hopefully he can get a lot accomplished!