Sunday, September 18, 2011

An Update....Finally

It's been hard to keep this updated with everything going on, Ethan's Rodeo, our new baby, Emelia, the house building.....etc! Here are some outside and inside shots of our progress. The plumbers have finished the rough-ins, the HVAC are finishing up our geothermal system rough-in, Dave has started on the electric wiring, siding is up on the East and partially on the North side of the house, the garage is up, all the stud walls are up, the cabinets are ordered, plumbing fixtures and lighting fixtures have been picked out and the tile/flooring is all picked out too. We are hoping to start drywall in the next couple weeks and to get the house sealed up before winter hits again. Dave thinks we could be in before the end of winter.....but winter technically goes until sometime in March!


Looking up from our great room....kind of hard to visualize, but the room on the left is the dining room.



The siding on the east side of the house.



A view from the winery road.




Another view from the winery road.

The kids shower/tub upstairs.

A look over our great room from the upstairs hallway




Our steps up to our landing.