Monday, September 6, 2010

Basement Floor

Picture of the geo-thermal and plumbing pipes.Getting Ready for the basement floor pour (with Ava's help!) Rebar has been set and they are ready to pour.
The tele-belt has arrived and they are about to start.

They poured a 4000 psi mix with some fly-ash, a total of 28 yards on Friday Sept 3rd.


Finishing the floor.

Papa and Kale watching the concrete truck!


The finished product!



Mounds of dirt that surround the house site!
ICF blocks should be arriving Saturday morning via a semi-truck from Omaha, Nebraska.